Builder

class Builder

Properties

Link copied to clipboard

The maximum number of nodes unavailable at once during a version update. Nodes are updated in parallel. This value or maxUnavailablePercentage is required to have a value.The maximum number is 100.

Link copied to clipboard

The maximum percentage of nodes unavailable during a version update. This percentage of nodes are updated in parallel, up to 100 nodes at once. This value or maxUnavailable is required to have a value.

Link copied to clipboard

The configuration for the behavior to follow during a node group version update of this managed node group. You choose between two possible strategies for replacing nodes during an UpdateNodegroupVersion action.